Water Main Break (St. Michael)

IMPORTANT: There is a water main break at the St. Michael water system. WATER is now SHUT OFF. Residents impacted should take steps to conserve water immediately. Repairs are in progress, but there is no estimated time for completion at this time. There will likely be a boil advisory at that time. Thank you for your patience as this is fixed.

Utility Master Plan

The purpose of the Utility Master Plan is to review potable water distribution over a 20-year planning horizon, to conduct a technical review of previously identified needs, and to update the infrastructure improvements and capital costs for the upcoming 20-year planning period. This assessment will help determine future water rates and off-site levy requirements. This Master Plan is also a critical component in the development planning process and is intended to harmonize the Lamont County’s water servicing strategies for the South Basin Lamont Industrial Heartland District.

Contents include information on:

  • Potable Water
  • Wastewater
  • Process Water
  • Salt Water
  • Stormwater
  • Utility Corridors
  • Financing
  • Recommendations and Servicing Plan

Lamont County Utility Master Plan (click to download .pdf)

Industrial Heartland (South Basin) Off-Site Utility Potable Water Levy Bylaw (739.14)

Off-Site Levy Utility Bylaw 739.14
Schedule A