Public Works Weekly Update (during peak periods)

Weekly Updates

Please review the notifications for updates and during weather events. Updates for gravel and drainage will be posted when weather/season allows. 

WEEKLY STATUS UPDATES (May 20-23):

Dust Abatement:

  • N/A

Road Gravelling:

  • Continues in Divisions 1 and 2. 
  • Cold Mix patching on Policy Roads and in St. Michael at 2024 catch basin installation locations.
  • Graders are actively maintaining gravel roads, as some roads are experiencing heavy agricultural use due to the time of the year.

Drainage Activities:

  • Drainage work in Division 1:
    • Culvert installation (southeast of Mundare).
  • Drainage work in Division 2:
    • N/A.
  • Drainage work in Division 3:
    • N/A.
  • Drainage work in Division 4:
    • N/A.
  • Drainage work in Division 5:
    • N/A.

Oiled Dust Abatement Patching:

  • N/A.

Miscellaneous:

  • Garbage pick up, as required.
  • Sign replacement, as required.
  • Tree removal, as required.
  • Reclaiming work is ongoing in the Weleschuk Gravel Pit.
  • Arrangements for Hamlet street sweeping. 